The method used in this study was a literature study related to scheduling studies based on construction projects. This study aims to assess project scheduling in general based on literature sources in the form of previous research (journals). In project planning, scheduling was very important in projecting the needed of manpower, materials, and equipment. Scheduling determines when activities will be started, postponed and completed, so that resource control will be adjusted to the needed that had been determined. To achieve this goal, developers, contractors, and project owners create a project implementation schedule as well as control the implementation of the project itself. Resources in the project were definitely limited so planning must be thorough and perfect. Faculty of Engineering, University of 17 Agustus 1945 SurabayaĬonstruction, Effectiveness, Methods, Scheduling Abstract